• CTU Simulator
  • CTU Simulator
  • CTU Simulator
  • CTU Simulator
  • CTU Simulator
  • CTU Simulator
  • CTU Simulator
  • CTU Simulator

CTU Simulator

Working Voltage 220 V 50 Hz AC

Rated Power 1500 W

Working Temperature-20 ℃~50 ℃

Display Resolution Single Screen/Multi-screen Visualization 1920*1080, 5400*1920, 3840*1080

In Stock

Description

Introduction
The system is for the operators of onshore and offshore coiled tubing units to practice operations and to get trained of the various operation processes.
Based strictly on the equipments at site, the system is an simulation, training and practicing platform combining the site bus communication, distributed control and virtual reality technologies.
The system covers the whole training process from teaching, learning, practicing and examination.

System Components
The system includes the main control console, kernel calculation mathematics model, teacher workstation, student workstation, image workstation and sound system.
It is equipped with teacher workstation mode and student workstation mode. The teacher workstation can provide simulation examination for the training and test of the students, and set working parameters and issue emergencies remotely for the students to handle.
Features
3D images, interactive actions, real-time and accurate animations, control console layout reflecting that of the real equipment, vivid environment sound and real-time voice prompts.
Digit-type and instrument-type display to ensure real-time data monitoring.
Systematic and complete training contents in the teacher workstation, flexible configuration of items such as online operation and single unit operation, and intelligent scoring system to ensure fair and justice.
Friendly user interface which is easy to learn and operate, and reliable software with high stability to avoid misoperations causing program failure.
Built-in functions such as common operation failures, warning and tips to help the students learn operating the unit and operation process.
Mathematics model with own intellectual property carries out simulation calculations according to the operation processes and actual running status, which meets the real process requirements.
Industrial PLC control is adopted to ensure stable operation and high reliability.



Functions of Online Operation System
The CTU simulation and training system based on the layout of the site equipment simulates the operation and conditions of CTU and displays the overall unit and some key parts (BOP, stripper, injector, Christmas tree, coiled tubing string, etc.):
For example:
Simulating the nitrogen gas lifting process with CTU
Simulating the sand removal and well flushing process with CTU
Simulating the fluid displacement process with CTU
Simulating the dragging acidizing process with CTU
Simulating the fracturing process with CTU
Simulating the fishing process with CTU
Simulating the installation and disassembly of CTU, including installation of lubricators, lifting of BOP and stripper, installation and removal of downhole tools, controlling the main valve on the Christmas tree, purging the fluid inside the coiled tubing with nitrogen, and disassembly of the injector and ground manifold.
……
(More simulation development ports for personalized operation processes are reserved.)

Operation and Simulation Functions of A Single Unit

Operation and Data Monitoring of the Main Unit

CTU specification (different tubing size) and performance simulation
Simulation of the CTU operations and display of corresponding simulation results
Simulating injector operations
Simulating the coiled tubing reel operations
Simulating stripper operations
Simulating the circulation system (fluid property) operations
Simulating BOP operations
Model of various downhole tools
Simulating the tubing in-hole and out-hole operations
Simulating the Christmas tree operations

Failure Simulation:
Hydraulic system failures
Well bore failures and tubing stuck
Coiled tubing gets bent and damaged.
Injector chain tension failures and traction failures
Reel tension failures
Stripper seal element leaks
Pipe ram of BOP failure and leaks
……
The system has built-in failure analysis function. According to Jereh’s years of site operation experience, the operation failures and equipment running failures can be analyzed in real-time to provide corresponding solutions.

Specifications
Working Voltage: 220 V 50 Hz AC
Rated Power: 1500 W
Working Temperature: -20 ℃~50 ℃
Display Resolution: Single Screen/Multi-screen Visualization 1920*1080, 5400*1920, 3840*1080
Mean Time Between Failures: ≥10000 hours
Overall Dimensions: 2300*1130*1325 mm

Inquire Now

Your Recently Viewed Items and Featured Recommendations